Analysis Of The Process For On-site Survey And Location Of Low-voltage Pole-mounted Circuit Breakers For 10kv Public Lines
When installing Lv Pole Mounted Circuit Breakers on a 10kV public line, the operation and maintenance department, management unit, safety supervision department, and dispatch center should jointly conduct a site survey to determine the installation location. During the site survey phase, technical personnel from each department should conduct a detailed investigation of the overhead line structure, conductor type, tower branching, load distribution, and operation and maintenance conditions of the proposed installation section. Through on-site measurements and verification with the line map, a comprehensive assessment should be conducted on factors such as the main line, branch lines and sub-branches, load concentration points, and future expansion potential.