Lv Pole Mounted Circuit Breakers Before restoring power, relevant operational information must be verified by the dispatcher. Staff must submit a detailed description of the fault, equipment model and location information, as well as a power restoration plan and steps; based on this, the dispatcher will assess the current network conditions, risk level, and on-site resource allocation, and then issue permission to connect the power supply.