The Importance Of Low-voltage Pole-mounted Circuit Breaker Operating Procedures
Publish Time: Author: Site Editor Visit: 0
Before commencing any Lv Pole Mounted Circuit Breakers operation, the work order serves as a crucial document between the on-site work and dispatch control. The work order details the planned power outage, the scope of the work, and risk warnings, providing dispatch personnel with the fundamental basis for assessing the on-site power grid condition. By reviewing the work order and issuing permission, dispatch personnel ensure that on-site operations are brought under unified command, preventing uncoordinated actions from causing grid malfunctions or exposing personnel to unnecessary electrical hazards.
