Blog

Installation Of Parallel Groove Clamps: Tighten The Bolt Torque In Stages In A Diagonal Sequence.

Publish Time: Author: Site Editor Visit: 294

To ensure that the force is evenly distributed at each fastening point bimetal pg clamp, a torque wrench should be used to tighten the clamps gradually in a diagonal sequence to maintain a consistent clamping force between the structural surfaces and avoid deformation or stress concentration caused by excessive tightening on one side.

Before starting, adjust the torque wrench to the desired torque value and verify the bolt and nut specifications. Then, place the blackburn parallel groove clamp clamp on the mounting surface and insert the bolts into the corresponding holes. Next, lightly tighten each bolt one turn diagonally until all bolts are initially engaged.

After initial tightening, increase the torque slowly in two to three steps, using the same diagonal sequence, until the torque wrench gives a "click." This allows the clamps to gradually and evenly conform to the structural surfaces, ensuring consistent load-bearing capacity for each bolt.

Installation Of Parallel Groove Clamps: Tighten The Bolt Torque In Stages In A Diagonal Sequence.

Next How To Judge The Quality Of "stainless Steel Cable Ties" From A Professional Perspective
// SMICO

Tell Us Your Requirements

Please feel free to contact us if you would like to know more about us.

smicopower@163.com

+86-13968775537

+86 13968775537

No. 88, Punan 6th Road, Economic Development Zone, Yueqing City, Zhejiang Province, China.

Contact Us

WhatsApp us