Epoxy Resin Sleeve Cabinet Fixing And Installation Process
As the connection point for cables or conductors passing through the cabinet shield, the positioning and installation method of epoxy bushing directly impacts the overall equipment layout. The industry standard is to directly embed epoxy resin bushing into the pre-drilled hole in the cabinet, positioning it via the structural flange face to ensure precise alignment of the axis of epoxy resin cast bushing with the cabinet opening. According to the installation instructions, epoxy bushing manufacturer should be placed perpendicular to the pre-drilled hole in the cabinet, aligned with the structural flange, and the insertion depth adjusted according to design requirements to meet on-site installation dimension specifications.
In actual engineering sites, the insertion depth of the epoxy bushing for transformer needs to be controlled to ensure a tight fit with the cabinet flange.