Why Must A Dispatcher Issue An Order And Permit Before Operating A Low-voltage Pole-mounted Circuit Breaker?
Publish Time: Author: Site Editor Visit: 8
Before performing on-site operations, operators must confirm the working environment and equipment status, and possess an operation ticket issued by the dispatcher before proceeding to the next step. In the dispatching system, only after the superior dispatcher issues a permission instruction through the system can the operator perform the specific operation of merging or splitting Lv Pole Mounted Circuit Breakers according to the operation ticket content. This is primarily to ensure that every action is traceable and verifiable.
