Blog

Two Main Reasons For Failure During Smart Meter Installation

Publish Time: Author: Site Editor Visit: 11

There are two main reasons for failure during installation of single phase smart energy meter: one is that the metrology and verification department did not open or issue an opening command after the test activity, and the other may be that smart wifi energy meter outputs an incorrect signal during the installation process.

Two Main Reasons For Failure During Smart Meter Installation

Next Vertical Fuse Disconnect Switch With Max Shock Resistance