Blog

The Conductor Surface Must Be Cleaned Before Installing The Parallel Groove Clamp.

Publish Time: Author: Site Editor Visit: 237

During the burndy parallel groove clamp installation work on site, if there is residual oxide film, grease, paint layer or impurities on the surface of the wire, a non-metallic medium will be formed between connector parallel groove and the conductor. According to the industry installation standard groove clamp: parallel groove Before connection, non-conductive materials should be removed from the contact surface. This medium hinders the direct metal contact between parallel groove clamp connector and the conductor metal, which may result in increased resistance or abnormal temperature rise after operation.

The Conductor Surface Must Be Cleaned Before Installing The Parallel Groove Clamp.

Next The Tensile Strength And Corrosion Resistance Of Stainless Steel Cable Ties Are Very Important.
// SMICO

Tell Us Your Requirements

Please feel free to contact us if you would like to know more about us.

smicopower@163.com

+86-13968775537

+86 13968775537

No. 88, Punan 6th Road, Economic Development Zone, Yueqing City, Zhejiang Province, China.

Contact Us

WhatsApp us