Operating Procedures For Clamping Torque Of Parallel Groove Lines
Publish Time: Author: Site Editor Visit: 1
Place pg clamps correctly in the wire trench according to the design position, and install the bolts one by one. In the initial stage, rotate with a low torque value to ensure that the bolts can evenly engage the single bolt parallel groove connector parts. Then, gradually increase the torque value diagonally until the specified standard is reached, thereby achieving a good fit between the fixture and the conductor.
