Instructions For Using Iot Remote Smart Meter

Publish Time: Author: Site Editor Visit: 13

The inspection valve of 3 phase energy meter wifi should be installed on the bypass pipe before and after energy meter 3 phase wifi, and the electrical device should be installed between the valves after smart energy meter 3 phase and wifi smart energy meter 3 phase.

In order to avoid power loss, the electric direct current in the pipeline before smart energy meter wifi and the check valve before three phase smart energy meter adopt a gate valve.

The current indication arrow of the shell of single phase smart energy meter should be consistent with the current direction, and the disk of smart wifi energy meter should face upward.