The top surfaces of high voltage standoff insulators or wall bushings installed on the same plane or vertical surface must be coplanar, and their centerlines must meet design requirements. The installation centerlines of busbar sections high voltage epoxy must be aligned. The bases or flanges must not be embedded in concrete or plaster.