Blog

Installation Method Of Box-type Ukk Junction Box

Publish Time: Author: Site Editor Visit: 338

The power splitter block installation method involves two steps: installation of the enclosure and installation of the interconnecting components within the enclosure.

For enclosures of type power splitter terminal block, installation is performed by the building construction department according to design requirements.

For enclosures of type power terminal box, the bottom edge should be 1000-1300mm above the floor, and the enclosure edge should be ≥1000mm from the wall corner.

Installation Method Of Box-type Ukk Junction Box

Next How Does Epoxy Sleeve Protect Pipes In Concrete Walls?
// SMICO

Tell Us Your Requirements

Please feel free to contact us if you would like to know more about us.

smicopower@163.com

+86-13968775537

+86 13968775537

No. 88, Punan 6th Road, Economic Development Zone, Yueqing City, Zhejiang Province, China.

Contact Us

WhatsApp us