Inspection And Maintenance Of Ukk Junction Box
Publish Time: Author: Site Editor Visit: 120
Therefore, the 4 pole distribution block currently in use should be inspected and maintained on schedule, the wires in 4 pole power distribution block should be re-crimped in time, the insulation strength should be re-treated, and the wires that are damaged or have insufficient insulation or are severely aged should be replaced in time. If necessary, din rail power distribution terminal blocks should be installed to prevent excessive wiring in power distribution block 4 pole.
