Improve The Efficiency Of High-voltage Disconnector Replacement And Accelerate Emergency Response.
When hv isolator switch needs to be replaced due to mechanical wear or contact aging, shortening the on-site replacement time helps reduce the system's power outage window, mitigates the impact of high voltage electrical isolator outages on scheduling, and thus improves the overall maintenance and scheduling flexibility.
In the event of an accident or sudden power outage, on-site dispatchers often need to quickly handle the operation of isolating fault isolator high voltage from the line. If the replacement process is meticulously planned, equipped with standardized pre-installed components, and the work team and material supply are coordinated, the on-site execution cycle can be significantly reduced, which is of practical significance for improving dispatching efficiency. In real-world maintenance cases, such optimizations can reduce the disturbance of temporary power outages to surrounding loads.
