How To Install Ukk Junction Box Indoors
Publish Time: Author: Site Editor Visit: 3
① For installation on corridor walls, din distribution block and electrical power distribution blocks should be installed above the picture line or power terminal blocks electrical, with the bottom 2500mm from the floor.
② For installation on interior walls, power distribution terminal and din power distribution should be installed above the baseboard, with the bottom earth distribution block 50mm from the baseboard.