Blog

How Do Parallel Trench Clamps Save On Cable Tray And Civil Engineering Costs?

Publish Time: Author: Site Editor Visit: 300

Traditional cable laying methods require reserving significant space for cable trays and concrete trenches for branch lines, accompanied by extensive civil engineering excavation and ductwork construction. However, using the pg clamp connector method, branching directly alongside the main cable reduces cable tray width and trench depth, thereby minimizing concrete embedding, trenching, and backfilling work. By concentrating branch connections on the main line segment, the number of cable tray support points decreases, and the spacing between hangers can be extended, further reducing costs associated with steel, construction labor, and installation structures.

How Do Parallel Trench Clamps Save On Cable Tray And Civil Engineering Costs?

Next Stainless Steel Cable Ties: An Essential Component In Industry And Daily Life
// SMICO

Tell Us Your Requirements

Please feel free to contact us if you would like to know more about us.

smicopower@163.com

+86-13968775537

+86 13968775537

No. 88, Punan 6th Road, Economic Development Zone, Yueqing City, Zhejiang Province, China.

Contact Us

WhatsApp us