Blog

High-end Process Requirements For Pre-insulated Sleeves

Publish Time: Author: Site Editor Visit: 345

All pre insulated sleeve products must undergo 15 extreme tests before leaving the factory, including high temperature and humidity (85°C x 85% RH x 1000h), thermal shock (-40°C → 125°C cycle 500 times), and alcohol wiping (500 times without swelling). The defective rate of pre insulated junction sleeve products must be controlled within 0.02%. These testing standards fully verify the long-term stability and safety reliability of insulated joint sleeve products in high temperature, humidity, and high mechanical stress environments.

High-end Process Requirements For Pre-insulated Sleeves

Next Testing The Destructive Force Of Piercing Clamps On Cables
// SMICO

Tell Us Your Requirements

Please feel free to contact us if you would like to know more about us.

smicopower@163.com

+86-13968775537

+86 13968775537

No. 88, Punan 6th Road, Economic Development Zone, Yueqing City, Zhejiang Province, China.

Contact Us

WhatsApp us