high voltage standoff insulators is an indispensable component of the power grid, and it is also a necessary condition to ensure the smooth operation of the power grid. Therefore, the correct installation of high voltage epoxy is very important. The following editor will talk about the correct installation method of epoxy resin insulator.

high voltage epoxy resin and wall bushings should be checked before installation. The porcelain parts and flanges should be complete and free of cracks, and the fillers at the glued parts should be complete and firmly combined.

The top surface of high voltage standoff or wall bushings installed on the same plane or vertical surface should be located on the same plane, and the center line position should meet the design requirements. The installation center line of the post insulators of the straight section of the busbar should be on the same straight line. Its base or flange shall not be buried in the concrete or plaster layer. When the post insulators are stacked, the center line should be consistent, the fixation should be firm, and the fasteners should be complete. The contact surface between the low-voltage post insulators with internal glue without base and top cap and the metal fixings should be padded with a buffer gasket such as rubber or asbestos paper with a thickness of not less than 1.5mm.

Correct Installation Method Of Epoxy Resin Insulator

Next Precautions For Installation And Use Of Sf6 Circuit Breaker Operating Mechanism